Before a lot of customer friends asked me about the hospital disinfection center space layout and other attention to the details of the details to give a simple explanation.
1, according to the specification, the air flow from clean to dirty; the confined space is better, including doors and windows, meet the three zone pressure, decontamination area remained relatively negative pressure, check the packaging and sterilizing area remain relatively positive pressure; independent air-conditioning system to meet the regional temperature and humidity, mechanical ventilation, air exchange frequency space to meet the illumination requirements.
2, the supply room must consider the high pressure sterilizer and steam sterilizer drainage pipe upstairs. It must be high temperature resistant, and the outside of the drainage pipe should be kept warm so as not to affect other floors.
3, the ethylene oxide exhaust pipe should be extended to the outside, and the ventilation equipment in the non ventilated room should be set up.
4. The supply room is not on the first floor, and the load-bearing capacity of the floor of the large equipment should be considered.
5, the closed transmission window is set up by the enlarged transmission window, which facilitates the transmission of the large operation package, and transfers the wired or wireless doorbell outside the window.
6, the wall of the room and the door of the room with moving vehicles, such as the reception hall and the granting hall, should be increased.
7. Integrated wiring: including the internal communication system, the computer information management system, the music broadcasting system, the visual access system and so on.
8, fire sprinkler and fire alarm system: including the unified coordination and management, and the whole building by the best qualified professional team to implement synchronization; others include evacuation lights the fire door and fire door installation to be responsible for the cleaning company, access control system requirements of the door is open to the inside, and the door to open fire channel requirements, the need to coordinate well, the best construction before the fire department to help plan approval.
9, inviting designers to work together to find out a good brother unit on site to make up for a short time. After the design and purification design of the decoration design institute are butted, the scheme of the decoration and purification is determined.
10, it is best to invites the professional purification construction team determined by the bidding to ensure the quality of the construction.